• How VoltMate worksThe connected workflow from enquiry to invoice
  • A working day in VoltMateFrom the first visit to the invoice
  • All VoltMate featuresBusiness, certification, technical and learning tools
  • Electrical learning hubEarthing, protection, testing, circuits, three-phase and exam revision
  • EICR and inspectionsInspection, observation, compliance and certificate workflow
  • Electrical certificatesPrepare, review, issue and keep traceable certificate records
  • AI Fault FinderStructured AI assistance for electrical troubleshooting
  • Exam practiceLevel 2, Level 3 and specialist electrical revision
  • 3D electrical learningInteractive animated models for core electrical concepts
  • Voltage drop workbenchCheck a twin and earth run against the 3% or 5% allowance
  • CalculatorsVoltage drop, cable sizing, Max Zs and more in the workspace
  • Pricing and plansCompare Free and Pro
  • QuestionsSchemes, phones, cancellation and regulations
  • Help CentreStep-by-step guidance for VoltMate
  • Blog and communityElectrical knowledge, updates and discussions
  • Contact supportGet help with your account or workflow
↑ ↓ to move · Enter to openEsc to close
Help Centre

AI & technical tools

Sector context and three-phase tools

Save the sector of clients, jobs and sites, choose the work you do, and understand what VoltMate's three-phase calculator does and does not decide.

sectordomesticcommercialindustrialpropertysite

Before you begin

  • Be signed in to use workspace Jobs and technical tools.
  • Use the actual project/site data and your competent professional judgement before relying on any calculation.

What sector context changes

Clients, jobs and saved sites can each have a saved sector: Domestic, Commercial, Industrial or Mixed. The same workflow then uses language that fits the work: Domestic work uses Property, Commercial uses Site and Industrial uses Facility.

The underlying canonical location record remains Property. Sector context changes presentation and optional hierarchy language; it does not create a separate Site or Facility identity.

An existing client type can suggest a sector, but the suggestion is never saved on its own: you confirm it with Use on the client and save. VoltMate never gives existing records a sector automatically.

Work you do, in Business & professional profile, is optional. It starts new clients, jobs and sites with that sector and wording. It never hides records or changes access, and lists always start at All sectors.

Use sector-aware job labels

  1. 1

    Open Jobs and create or edit the correct work record.

  2. 2

    Choose an existing saved location when it is the correct Workspace Property, or use the manual address option deliberately.

  3. 3

    Check the Sector field. Under it, VoltMate shows where the value came from: the saved site, the client, your work preference, or your own choice for this job. Change it if this job is different.

  4. 4

    Review the displayed Property, Site or Facility wording as presentation context; the saved job address remains the point-in-time record for that job, and the job keeps its sector when the site or client changes later.

Use the three-phase calculator

  1. 1

    Open Calculators and choose Three-Phase Load & Balance.

  2. 2

    Enter the three-phase active power, line-to-line voltage and power factor for the calculation you want to review.

  3. 3

    Enter L1, L2 and L3 line currents when you want a descriptive phase-current balance result.

  4. 4

    Review calculated line current, apparent power, average phase current and imbalance percentage together with the assumptions shown on the page.

  5. 5

    Use the Knowledge Base link for related design guidance and verify the result against project-specific information before acting on it.

The imbalance percentage is descriptive. VoltMate does not apply one universal pass/fail threshold to every installation or item of equipment.

Professional boundary

The three-phase tool is preliminary calculation assistance. It does not select cable size or protective devices, prove discrimination, assess all fault/protection requirements, or declare an installation compliant or safe.

Common mistakes

  • Pressing Use on a client-type suggestion without checking it. Landlord and Other suggest nothing, because the right sector depends on the property.
  • Creating a second location because the UI says Site or Facility even though the same canonical Property already exists.
  • Using a calculated current or imbalance percentage as a substitute for the full design, installation data, manufacturer requirements or competent-person assessment.
  • Entering phase-to-neutral voltage when the calculator is asking for line-to-line voltage.

Troubleshooting

If the Job terminology does not match the work, check the job's Sector field and where it came from. With no sector saved, VoltMate uses neutral Site / Property wording rather than guessing one.

If a three-phase result looks wrong, check the units, line-to-line voltage, power factor and phase-current inputs first. A calculation can only reflect the data entered and the balanced-load assumptions stated by the tool.

Related guides