• How VoltMate worksThe connected workflow from enquiry to invoice
  • A working day in VoltMateFrom the first visit to the invoice
  • All VoltMate featuresBusiness, certification, technical and learning tools
  • Electrical learning hubEarthing, protection, testing, circuits, three-phase and exam revision
  • EICR and inspectionsInspection, observation, compliance and certificate workflow
  • Electrical certificatesPrepare, review, issue and keep traceable certificate records
  • AI Fault FinderStructured AI assistance for electrical troubleshooting
  • Exam practiceLevel 2, Level 3 and specialist electrical revision
  • 3D electrical learningInteractive animated models for core electrical concepts
  • Voltage drop workbenchCheck a twin and earth run against the 3% or 5% allowance
  • CalculatorsVoltage drop, cable sizing, Max Zs and more in the workspace
  • Pricing and plansCompare Free and Pro
  • QuestionsSchemes, phones, cancellation and regulations
  • Help CentreStep-by-step guidance for VoltMate
  • Blog and communityElectrical knowledge, updates and discussions
  • Contact supportGet help with your account or workflow
↑ ↓ to move · Enter to openEsc to close
Help Centre

Inspections & certificates

Inspections and the certificate lifecycle

Move from authoritative inspection data through review and issuing without bypassing professional judgement or immutable certificate history.

inspectioncertificateeicreicminor worksissue

Before you begin

  • Use the workflow only within your competence and authority.
  • Complete the necessary inspection, test and professional-review information before issuing.

Authoritative workflow

From inspection to a verifiable certificate

  1. 1

    Inspection

    Record the installation, circuits, test results and observations.

  2. 2

    Compliance review

    Complete the certificate particulars and your declarations. Anything still blocking issue is listed.

  3. 3

    Final assessment

    Choose the outcome, confirm you have reviewed the record, then confirm the assessment.

  4. 4

    Certificate draft

    Prepare certificate builds a draft from the verified record. Review the wording.

  5. 5

    Issue

    Confirm the issue. The issued version is fixed and gets a snapshot hash.

  6. 6

    Verification

    The QR code and reference let anyone check the certificate's status on the public verification page.

Each stage uses the record from the stage before. After issue, corrections are made by amendment, never by editing the issued version.

VoltMate follows the boundary: Inspection / authoritative technical data → Certificate Draft → Review → Issue → Immutable Issued Certificate.

AI and convenience features can assist preparation, but they must not silently decide or alter authoritative test values, observation classifications, declarations or professional judgement.

Prepare and issue

  1. 1

    Open Inspections and create or select the correct inspection record.

  2. 2

    Record the applicable installation, circuit, test and observation information.

  3. 3

    Review observations and the final assessment. Recorded C1 or C2 findings prevent a Satisfactory EICR assessment; FI is advisory and does not by itself force Unsatisfactory.

  4. 4

    Complete the compliance/readiness review and any declarations that require the electrician's own judgement. Compliance review lists 24 inspections per page; its counts cover all of them.

  5. 5

    Prepare and review the certificate draft before issuing.

  6. 6

    Issue only when the record is ready and you are satisfied the document is correct.

Understanding the test value fields

The Test results tab uses short labels such as r1, R1 + R2, Zs, Ze, PFC and 1 × IΔn. Each one has a plain-language note:

  • With a mouse, hover over a label with a dotted underline.
  • With a screen reader, the note is read when you move to the field.
  • On any device, open Guide to the test values at the top of the tab. It lists every note in one place.
The notes explain what each value is. They give no limits and do not say which tests your procedure requires: take limits from your reference source and record them in the circuit's reference fields.

Notes on the supply, circuit and compliance fields

Other fields with technical names have the same kind of note: the supply fields on the Installation tab and in Workspace setup, the circuit editor on the Circuits tab, and the supply, earthing and board fields in the compliance review.

  • Hover over a dotted label, or move to the field with a screen reader.
  • Open Guide to the supply fields, Guide to the circuit fields or Guide to the supply, earthing and board fields to read every note for that form.
These notes say what a field means and what to record. They give no limits or required sizes, and VoltMate does not decide compliance for you.

After issue

An issued certificate version is immutable. VoltMate stores a snapshot hash and links later versions through the previous snapshot hash. If a correction is required, use the amendment/version workflow rather than rewriting issued history.

A certificate can also move through lifecycle states such as amended or void while earlier issued versions remain independently preserved.

Common mistakes

  • Treating auto-filled information as reviewed professional judgement.
  • Changing observations without re-checking the final assessment/readiness state.
  • Trying to edit historical issued versions instead of creating an amendment.
  • Confusing cryptographic snapshot integrity with a statement that a certificate is currently valid for use.

Troubleshooting

If certificate preparation is blocked, return to the inspection and review the readiness/compliance messages rather than bypassing them. If an issued document needs correction, locate the current certificate and use the supported amendment lifecycle.

VoltMate software does not certify competence or electrical safety. The competent person remains responsible for inspection, testing, classification, declarations and the final document.

Related guides