• How VoltMate worksThe connected workflow from enquiry to invoice
  • A working day in VoltMateFrom the first visit to the invoice
  • All VoltMate featuresBusiness, certification, technical and learning tools
  • Electrical learning hubEarthing, protection, testing, circuits, three-phase and exam revision
  • EICR and inspectionsInspection, observation, compliance and certificate workflow
  • Electrical certificatesPrepare, review, issue and keep traceable certificate records
  • AI Fault FinderStructured AI assistance for electrical troubleshooting
  • Exam practiceLevel 2, Level 3 and specialist electrical revision
  • 3D electrical learningInteractive animated models for core electrical concepts
  • Voltage drop workbenchCheck a twin and earth run against the 3% or 5% allowance
  • CalculatorsVoltage drop, cable sizing, Max Zs and more in the workspace
  • Pricing and plansCompare Free and Pro
  • QuestionsSchemes, phones, cancellation and regulations
  • Help CentreStep-by-step guidance for VoltMate
  • Blog and communityElectrical knowledge, updates and discussions
  • Contact supportGet help with your account or workflow
↑ ↓ to move · Enter to openEsc to close
Help Centre

AI & technical tools

Calculators

Run preliminary electrical calculations and review checklists for voltage drop, cable sizing, maximum demand, protective devices, earth fault loop, RCDs, EV, solar and battery work.

calculatorcalculatorsvoltage dropcable sizecable sizingmaximum demand

Before you begin

  • A VoltMate account.

What the calculators cover

  • Three-Phase Load & Balance, Circuit Load, Ohm's Law and a General Calculator for everyday electrical arithmetic.
  • Voltage Drop and Cable Size Assistant for preliminary cable checks from length, load and cable data.
  • Maximum Demand for connected load and preliminary maximum demand.
  • Protective Device Helper, Earth Fault Loop and RCD Selection to compare device and protection considerations.
  • EV Charger Assistant, Solar PV Assistant and Battery Storage to review supply, load, earthing and connection inputs for that work.

Use a calculator

  1. 1

    Open Calculators and choose the tool.

  2. 2

    Choose the supply type where asked, for example single-phase or three-phase.

  3. 3

    Enter your values in the units shown. Where a tool asks for cable or device data, take it from the manufacturer's data or the current edition of the standard you work to.

  4. 4

    Read the result together with the assumptions and warnings shown beside it.

  5. 5

    Record the verified design values in your own design or certificate records.

What a result means

Results are preliminary checks from the values you enter. They are not a design approval or a compliance certificate, and they do not replace verification against the current regulations, the manufacturer's data and testing on site.

The competent person remains responsible for the design and for every value recorded on a certificate.

Common mistakes

  • Entering a phase-to-neutral voltage where the tool asks for line-to-line voltage, or the reverse.
  • Multiplying a single-phase mV/A/m value by √3 for a three-phase circuit. Voltage Drop takes the cable's single-phase value and converts it for you (× √3/2), then compares the drop between lines with the line voltage, 400 V by default.
  • Using cable data from the wrong reference method or the wrong table.
  • Treating an assistant's checklist as a finished design.

Troubleshooting

If a result does not appear, check that every required value is filled in and uses a full stop for decimals. If a result looks wrong, check the units first.

Related guides